| Brand Name: | HY |
| Model Number: | 04 |
| MOQ: | 1 piece |
| Delivery Time: | 3 work days |
| Payment Terms: | Prepayment starting from 30% |
Product Introduction
This heavy-duty site accommodation solution is designed for construction projects, providing instant offices, worker dormitories, and storage spaces. Prefabricated with 95% factory completion, it requires only on-site lifting and basic utility connections to become operational, addressing the urgent need for fast, reliable temporary facilities in demanding construction environments .
Key Advantages
Rapid Deployment: Standard models can be delivered within 3–7 days for urgent projects.
Durable Structure: 2.5mm steel frame with reinforced columns supports long-term use and repeated relocation.
Safety Compliant: A1 fire-rated rock wool panels and branded electrical components with leakage protection.
Flexible Layouts: Units can be horizontally combined or vertically stacked.
Cost-Effective: 30% lower overall cost compared to traditional temporary buildings, with reusability across projects.
Product Parameters
|
Parameter |
Specification |
|---|---|
|
External Dimensions |
2990mm(W) × 6055mm(L) × 2896mm(H) |
|
Main Structure |
2.5mm steel frame, 150×210mm reinforced columns |
|
Wall System |
75/1150 type rock wool panel (0.3mm color steel both sides) |
|
Roof System |
0.45mm iron sheet + butyl tape waterproofing, 4× PVC drains |
|
Thermal Insulation |
75mm glass wool with PE membrane |
|
Doors & Windows |
1 anti-theft door, 2 double-glazed windows with grilles |
|
Electrical System |
6-circuit distribution box (RCD + breakers), LED lights, sockets |
|
Flooring |
1.8cm cement board + 1.6mm vinyl flooring |
Use Case
A highway construction project in mountainous terrain used 200 units for site offices, labs, and worker dormitories. The excellent thermal insulation maintained stable indoor temperatures despite large day-night variations, and rapid installation helped complete the project 3 months ahead of schedule .
Q&A
Q: Is a foundation required for site use?
A: Only simple ground leveling is needed. For soft soil or multi-story stacking, we provide foundation design drawings.
Q: Can it accommodate peak workforce demands?
A: Yes, with bunk bed configurations, each unit can house 6–8 people, and additional units can be quickly deployed.
Q: What maintenance is needed?
A: Inspect roof waterproofing and electrical systems every 6 months; we offer free technical guidance.